Certificate of conformance
Verify valuesCERTIFICATE OF CONFORMANCE REQUIRED WITH EACH SHIPMENT, INCLUDING MATERIAL AND FINISH LOT NUMBERS.SE REQUIERE CERTIFICADO DE CONFORMIDAD CON CADA EMBARQUE, CON NÚMEROS DE LOTE DE MATERIAL Y ACABADO.Home › Drawing notes › Quality, marking and packaging
Free drawing notes library
6 copy-ready notes for quality, marking and packaging, in English and Spanish. Copy a note, replace the [bracketed] example values, and check the "Watch for" line before you release the drawing.
Values in [brackets] are examples; replace them with your own. Notes marked Verify values rely on common practice; confirm them with your supplier or design engineer. These notes are examples, not an engineering approval of your drawing.
QAP-01 Certificate of conformanceQAP-02 Critical characteristics and SPCQAP-03 Change controlQAP-04 PackagingQAP-05 Individual protectionQAP-06 Process control dimensions
CERTIFICATE OF CONFORMANCE REQUIRED WITH EACH SHIPMENT, INCLUDING MATERIAL AND FINISH LOT NUMBERS.SE REQUIERE CERTIFICADO DE CONFORMIDAD CON CADA EMBARQUE, CON NÚMEROS DE LOTE DE MATERIAL Y ACABADO.[◇] INDICATES A CRITICAL CHARACTERISTIC: 100% INSPECT, OR SPC WITH Cpk ≥ [1.33].[◇] INDICA CARACTERÍSTICA CRÍTICA: INSPECCIONAR AL 100% O CONTROLAR POR SPC CON Cpk ≥ [1.33].NO CHANGE TO MATERIAL, PROCESS, TOOLING OR SUPPLIER WITHOUT WRITTEN APPROVAL.NO SE PERMITEN CAMBIOS DE MATERIAL, PROCESO, HERRAMENTAL O PROVEEDOR SIN APROBACIÓN ESCRITA.PACKAGE TO PREVENT DAMAGE AND DISTORTION. LABEL EACH CONTAINER WITH PART NUMBER, REVISION, QUANTITY AND DATE.EMPACAR PARA EVITAR DAÑOS Y DEFORMACIÓN. ETIQUETAR CADA CONTENEDOR CON NÚMERO DE PARTE, REVISIÓN, CANTIDAD Y FECHA.[BAG / WRAP] EACH PART INDIVIDUALLY. NO PART-TO-PART CONTACT ON SURFACES MARKED [△32].[EMBOLSAR / ENVOLVER] CADA PIEZA POR SEPARADO. SIN CONTACTO ENTRE PIEZAS EN LAS SUPERFICIES MARCADAS [△32].[99] INDICATES A PROCESS CONTROL DIMENSION: MONITOR DURING PRODUCTION, NOT FOR FINAL ACCEPTANCE.[99] INDICA DIMENSIÓN DE CONTROL DE PROCESO: MONITOREAR EN PRODUCCIÓN, NO ES DE ACEPTACIÓN FINAL.Fred checks your PDF drawings against ASME Y14.5 and sends a findings report: every correction located by sheet and zone, with what to change and why. From $29 a sheet. NDA first.